Specifications include, but are not limited to: The new pedestals must be mounted a minimum of 2" above thefinished hut floor or grade (if grade mounted) on a stainless steel riserto prevent the entry of rock salt into the pedestal base. Existing fabricated risers at Turnpike sites may be reused.c. The Contractor shall be responsible to provide and install stainless steelrisers for all Parkway locations.d. All electrical and communications wiring to the site controller shallconform to the manufacturer's specifications in addition to all state andfederal codes that are pertinent.e. The existing island conduit and wiring is assumed to be re-usable. TheContractor shall immediately bring to Authority attention any problemswith the re-use of the existing wiring and conduit. An optional bid forthe cost (per-foot) cost of replacing conduit is required (see page 10).Power and communication cabling or wireless communication to sitecontrollers will be provided by the Authority.4.System Commissioninga. Project will be delivered turnkey to the Authority. It is the soleresponsibility of the Contractor to ensure all installations, start-ups,system integration with other Authority-owned equipment andsystems are done to the manufacturer's specification by qualifiedand certified technicians.b. The Contractor shall provide all services to establish the new systemand transition from the old systems (Gasboy "PC 1000" and Gasboy"PC CFN").c. Training shall be provided by the Contractor to the SystemAdministrator, Authority IT representative, and designees at ourfacility in Woodbridge, NJ.d. All needed Administration software must be provided to SystemAdministrator and the Authority IT representative and 5 additionalcopies must be provided in CD format.e. Two (2) bound paper manuals shall be provided at each site with allnecessary user and service instructions. Three (3) CD-ROM versionsshall be provided to the System Administrator. The Contractor shall provide all labor, material and equipment required toinstall the new Dispensers.b. All wiring to the Dispensers shall conform to the manufacturer's specificationsin addition to all state and federal codes that are pertinent. The existingconduit and wiring is assumed to be re-usable. The Contractor shouldimmediately bring to the Engineer's attention any problems with the re-use of the existing wiring and conduit. A quote for per-foot cost of replacingconduit is required.c. The existing hanging hardware is assumed to be re-usable. The Contractorshould immediately bring to the Engineer's attention any problems with there-use of the existing hanging hardware