The scope of this project includes, but is not limited to, the partial replacement and restoration of the roof at Hopatcong High School. Approximately 75,000 square feet of the existing roof membrane and insulation system will be removed down to the existing decking and replaced with a new multi-ply built-up roof membrane and insulation. Approximately 24,500 square feet of the existing roof system will be properly prepared and primed to receive a new fluid-applied roofing system. The project also includes the replacement and installation of new metal edging, skylights, roof drains, and flashing, as indicated. Select rooftop units will be relocated and provided with new curbs and additional structural reinforcement