The Project generally includes: roadway and miscellaneous related improvements to Laurel Street in the City of Beverly, Burlington County, New Jersey. 1. Remove Concrete 25.0 SY 2. Remove Manhole 3.0 UN 3. Tree Removal, Over 12" to 18" Diameter (If & Where Directed) 1.0 UN 4. Tree Removal, Over 30" to 36" Diameter (If & Where Directed) 1.0 UN 5. HMA Milling, 4" 1,200.0 SY 6. Hot Mix Asphalt 19 M 64 Base Course, 2.5" Thick 190.0 TON 7. Hot Mix Asphalt 9.5 M 64 Surface Course, 1.5" Thick 115.0 TON 8. Hot Mix Asphalt Pavement Repair (If & Where Directed) 350.0 SY 9. Concrete Sidewalk, 4" Thick 130.0 SY 10. Concrete Sidewalk, 6" Thick 70.0 SY 11. Concrete Driveway, 6" Thick 60.0 SY 12. Concrete Swale, 8" Thick 135.0 SY 13. Concrete Vertical Curb, 6"x8"x18" 700.0 LF 14. Header Curb, 6"x10" (If & Where Directed) 50.0 LF 15. Detectable Warning Surface 14.24 SY 16. Manhole, 4' Diameter 2.0 UN 17. Inlet, Type D 4.0 UN 18. Reconstructed Manhole, Using Existing Casting 1.0 UN 19. Construct 12" DIP 50.0 LF 20. Construct 15" CPP 360.0 LF 21. Construct 18" CPP 140.0 LF 22. Traffic Markings Lines, 6" 510.0 LF 23. Traffic Markings Lines, 24" 65.0 LF 24. Curb Painting 525.0 LF 25. Regulatory and Warning Sign 4.0 UN 26. Topsoil and Seed, 4" Thick (If & Where Directed) 25.0 SY 27. Asphalt Price Adjustment 1.0 DOL 28. Fuel Price Adjustment 1.0 DOL