Scope of work: It is not the intent of this Scope of Work to explicitly define every detail or task required to complete the installation and configuration of replacement UPS units. The bidder shall use their experience and specialized skills to perform a complete, safe, quality installation that complies with all current National Electrical Code, State of New Hampshire, and City of Manchester Code requirements. The detailed Scope of Work shall include (but not be limited to) the following items: • Supply all materials, equipment, labor required to complete the installation. Supply all permits as required by the authorities having jurisdiction. • Propose replacement UPS units for existing Eaton Blade units. • Coordinate plant shut downs with WTP staff. • Remove, Reclaim and dispose existing UPS equipment; • Install new UPS system in existing MWW climate controlled server rack • Terminate Input to UPS from in accordance with all NEC requirements; • Connect UPS output to existing electrical system in accordance with all NEC requirements; • Clean up work areas and secure day of installation; • Start-up system and test for proper operation. • Provide on-site training for MWW staff on operation and maintenance of units