Specifications include, but are not limited to: 202.7 REMOVAL OF GUARDRAIL LF 12,700.00 203.1 COMMON EXCAVATION CY 115.00 203.11 COMMON EXCAVATION - LRS CY 75.00 203.5540 GUARDRAIL TAPERED RAIL PLATFORM LF 725.00 203.5561 EAGRT PLATFORM PREFERRED U 49.00 203.5562 EAGRT PLATFORM ALTERNATE U 3.00 203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 4.00 203.5572 EAGRT PLATFORM ALTERNATE, TL 2 - 25' U 2.00 203.5596 GUARDRAIL E-2 PLATFORM LF 100.00 203.601 EMBANKMENT-IN-PLACE CY 80.00 206.1 COMMON STRUCTURE EXCAVATION CY 26.00 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 250.00 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,000.00 403.12 HOT BITUMINOUS PAVEMENT, HAND METHOD TON 60.00 410.22 ASPHALT EMULSION FOR TACK COAT GAL 7.00 565.733 BRIDGE APPROACH RAIL F (3-BAR) (MODIFIED) U 1.00 565.802 ADJUSTING BRIDGE APPROACH RAIL U 5.00 565.81 REHABILITATION OF BRIDGE APPROACH RAIL U 1.00 570.4 MORTAR RUBBLE MASONRY (F) CY 3.00 585.3 STONE FILL, CLASS C CY 23.00