1. Preparation of Site: a. Clean and sweep the entire asphalt surface to remove all loose debris, dirt, and vegetation. b. Remove any failed or damaged pavement sections and properly prepare damaged areas prior to overlay. c. Apply tack coat (asphalt emulsion) to all existing asphalt surfaces to ensure proper bonding of overlay. 2. Paving Work: a. Install a 1.0" to 1.5" hot mix asphalt (HMA) overlay across the entire parking area. b. Ensure proper grading and slope to promote water drainage away from buildings and pedestrian areas. c. Compact overlay with appropriate rollers to meet industry and local specifications. 3. Line Striping: a. Re-stripe all existing parking stalls, accessible spaces, fire lanes, directional arrows, and other markings to match current layout unless directed otherwise. b. Use traffic-grade paint in accordance with applicable standards and ADA requirements. 4. Traffic Control and Site Access: a. Provide necessary signage, barricades, and flagging to safely direct pedestrian and vehicular traffic during construction. b. Coordinate work schedule with the Town to minimize disruption to municipal operations. 5. Final Cleanup: a. Remove all construction debris, equipment, and materials from the site. b. Leave the work area clean and free of hazards.