Specifications include, but are not limited to: This pr oje c t w ill rehabilitate the main access road to the Prison and construct drainage improvements to the perimeter roadway. The main access road will be rehabilitated by reclaiming the existing pavement, then graded and paved. The roadway will also require reconstructing the stone lined slopes and drainage swales with underdrains along the edge of the road. The perimeter road will have a new underdrain and stone lined swale installed, along the cut-side of the roadway.The main access road w ill need to be completed so that the P r is on can continue running under normal day to day operations. P e r mits and traffic control plans will be required for the project.The awarded Contractor will be required to have all employees working on-site submit to background checks prior to working. See sections 002500 Special Conditions, and 01100 Summary, for more information regarding the facilities’ entry controls and use of the site.