Specifications include, but are not limited to: The selected engineer would be involved in developing BMP designs and load reduction models for some or all of the projects listed below and/or projects of similar scope, depending upon various factors such as Town or landowner participation in the project. The subject sites are: RESIDENTIAL site 2019: • Berry Bay, Freedom, NH, identified in the WMP Phase 1, pg. 91. The main issue seen from photographic evidence is runoff and erosion. Conceptual solutions could include runoff diversions where a parking lot/yard drains to Berry Bay. Plantings of native species (vegetated buffer) could be built to filter runoff and stabilize the area. COMMERCIAL Sites for 2019-2020: • Danforth Bay Campground is a high impact, priority site identified in the WMP Phase 1, pg. 87 Appendix D: Shoreline Survey Results. Freedom, NH town Map 60, Lot 1. This is the largest project, anticipated to involve four BMPs on that property. We have prioritized this site in 2019 due to the amount of runoff seen on the dirt roads, the close proximity to buildings on the water’s edge, beach erosion near the buildings, and due to the heavy cyanobacteria blooms just off the beach in the summer of 2018. Please see Appendix A for photos. GMCG has complete commitment from the Campground to work with us to implement the BMPs.