Specifications include, but are not limited to: he New Hampshire Fish and Game Department (NHFG) requires an autumn 2019 extraction and spring 2020 install of three (3) temporary steel extension piles for the seasonal dock at NHFG’s Wellington State Park boat ramp in Bristol, NH that accesses Newfound Lake. In addition, the NHFG seeks assistance retrieving and deploying the seasonal floating dock and gangway system associated with the extension piles. The assistance can be provided without resetting the crane position or configuration. The Contractor shall provide all necessary and appropriate strapping or cabling (“strapping”) to NHFG personnel for securing to the dock segments, gangway and extension piles to complete this project. NHFG will provide a boat to support the extension pile and dock retrieval/deployment activity as needed. The Contractor will not need to supply a diver