Specifications include, but are not limited to: The Manchester School District and Manchester School of Technology (MST), through the Facilities Division of the Department of Public Works, City of Manchester intends to have constructed on the campus of the Manchester School of Technology, a 24’ x 24’ pre-engineered, steel framed structure which shall be used as a workshop. The workshop will have a bare concrete floor, single garage door, windows, lighting, compressed air (extension from school), electrical outlets, heat, security system, fire alarm system and sprinkler suppression. There are no provisions for running water or drainage. All items listed below are to be supplied and installed by the bidding contractor. Submittals (after award of contract) are to be supplied before work to begin for all items and owner approval. It is anticipated (if funding is approved) to begin work in April or May of 2020 and be completed by early September 2020. This is a design build project.