1. PREPARE SUBSTRATE USING COATING GUIDELINES WHICH MAY INCLUDE ABRASIVE SAND BLASTING, HIGH PRESSURE WASH, HAND ABRADING. 2. PREPARE AND LINE VESSEL WITH 120MILS NOMINAL/80MILS MINIMAL OF DURACHEM 500 SERIES HIGH PERFORMANCE AROMATIC POLYUREA SYSTEM. NSF RATED, 100% SOLIDS, NO VOC. 3. SPRAY TANK USING DURACHEM SERIES PLURAL COMPONENT EQUIPMENT CREATING MONOLITHIC LINING SHELL, AP FUSSION SSTL GUN, SYSTEM SET POINTS 2100PSI/165F. 4. COATING TANK INTERIOR. 5. MOBILIZE CREW, FIELD ENGINEER AND ROLLING STOCK TO SITE. 6. PROVIDE EQUIPMENT INCLUDING RESCUE PLAN & APPARATUS, HOISTS, HARNESSES, ROPES . PROVIDE MULTI GAS AIR SAMPLE METER TO MONITOR CONDITIONS FOR SAFE ENTRY AND PERMIT DOCUMENTATION. 7. PURGE AND VENT TANK, USING OSHA APROVED CONFINED SPACE PROTOCOLS. 8. SUPPLY ALL ELECTRIC AND COMPRESSED AIR NEEDS FOR THE PROJECT TYPICALLY (1) 100AMP SINGLE PHASE, (2) 50AMP SINGLE PHASE (1) 480V 3PHASE IF NEEDED, COMPRESSED AIR MIN 375CFM MULTIPLE UNITS AS NEEDED. 100' CABLE AND HOSE RUN INCLUDED IN ESTIMATE. 9. TEST SUBSTRATE FOR CHLORIDE CONTAMINATES. IF READING IS MORE THAN 7PPM, TREAT WITH CHLORID SOLUTION AND RETEST SURFACE. 10. PROVIDE DUST COLLECTION FOR BLASTING OPERATIONS AS NEEDED, IF DUST CAN EXHAUST TO OUTSIDE AIR OTHER PROVISIONS CAN BE DISCUSSED. 11. PROVIDE DEHUMIDIFIER AND OR AIR VENTILATION IF NEEDED TO BRING ATMOSPHERE TO PROPER COATING SPECIFICATION. 12. NDT ENTIRE TANK USING ELCOMETER HIGH VOLTAGE 236 DC HOLIDAY DETECTOR.