Specifications include, but are not limited to: Rooftop Snow Removal Contractor shall furnish necessary labor, equipment, and expertise to remove excess snow from rooftops and building perimeters at the Tobey Building, 45 South Fruit Street, Concord, NH (18,000–20,000 sq. ft. PVC membrane roof). Contractor will leave approximately 6” of snow to protect roof surfaces and materials. Snow removed from roofs and deposited into walkways, parking areas, or in front of HVAC equipment, generators or windows, must be removed. The Tobey Building and other State facilities do not have space for on-site snow storage. Removal of shoveled snow from facilities should be done immediately if possible, but always within 48 hours.