202.7 REMOVAL OF GUARDRAIL LF 14,864.00 203.5561 EAGRT PLATFORM PREFERRED U 15.00 203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 1.00 203.5598 GUARDRAIL E-3 PLATFORM LF 362.50 206.1 COMMON STRUCTURE EXCAVATION CY 29.20 206.19 COMMON STRUCTURE EXCAVATION EXPLORATORY CY 25.00 304.301 CRUSHED GRAVEL CY 11.70 304.32 CRUSHED GRAVEL FOR SHOULDER LEVELING TON 1,000.00 403.11841 HBP-1/2" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 1 TON 18,277.60 403.11842 HBP-1/2" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 2 TON 8,318.70 403.11851 HBP-3/8" SURFACE MIX, MACHINE METHOD, POLYMER MODIFIED, QC/QA TIER 1 TON 438.90 403.12 HBP-HAND METHOD TON 2.00 403.16 PAVEMENT JOINT ADHESIVE LF 208,694.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 26,596.40 410.22 ASPHALT EMULSION FOR TACK COAT GAL 11,146.80