Specifications include, but are not limited to: 1. Exercise caution when maneuvering to avoid damage to containment walls. 2. Inspect tank, fittings and liquid level indicator prior to filling. 3. Place drip pans under all hose fittings prior to loading or unloading. 4. Block truck wheels before starting to load or unload. 5. Remain with the vehicle while loading or unloading. 6. Drain loading or unloading line to storage tank when loading or unloading is complete. 7. Verify that all drain valves are closed before disconnecting loading or unloading lines. 8. Inspect vehicle before departure to be sure all loading or unloading lines have been disconnected and vent valves are closed. 9. Immediately report any leakage or spillage to the onsite State personnel. 10. All delivery vehicles will be equipped with appropriate hardware to seal delivery-line to prevent over-fills and/or spills. If a spill should occur during delivery, the bidder assumes all physical and financial responsibility, as well as, all liability for any spill. All corrective action will take place within 24 hours upon incident awareness. 11. Delivery personnel will shut off all electrical devices (cellular phones, pagers etc.) while unloading product.