Specifications include, but are not limited to: This project consists of the following areas and major components: Pipe Removal and Replacement – The contractor shall install new drainage pipe from North Main St to Drainage Manhole 104, and remove and replace the existing drainage pipe and structures from there to the railroad tracks. Disturbed areas shall be restored to existing conditions. Work shall be completed in accordance with contract documents. New Pipe Installation: 238 LF of 36” Reinforced Concrete Pipe Class IV Remove and Replace Pipe: 8 LF of 12” Reinforced Concrete Pipe Class IV 16 LF of 24” Reinforced Concrete Pipe Class IV 206 LF of 48” Reinforced Concrete Pipe Class IV 45 LF of Ductile Iron Sewer Pipe 100 LF of PVC Sewer Pipe Structures: One Junction Structure 12’ deep in a Major Intersection Two 6’ DIA Drainage Manholes 8’ and 10’ Deep Two 8’ DIA Manhole 8’ and 16’ Deep Site Work – The contractor shall complete various other work shown on the plans. This includes, but is not limited to removing asphalt, fine grading, and repaving a section of the parking area, relaying sewer services, removing large trees, resetting granite curbing, replacing sidewalks, restoring lawns, and installing and maintaining proper erosion control measures, in accordance with contract documents.