Specifications include, but are not limited to: Development of a design package for the stormwater management practices to achieve the results identified in 1 and 2 above under “RESULTS TO BE ACHIEVED THROUGH PROPOSED IMPROVEMENTS” and identified in the NHDES Watershed Assistance and SCC Conservation Grant Documentation. The design package and associated work shall include: 1. Construction-ready plans for the BMPs that ideally can be installed in 2 – 4 days and include proposed construction sequences, site preparation/stabilization plans and schedules. 2. Perform ROW and site features survey to locate existing edge of pavement, centerline, adjacent shoulders and side slopes, wetlands flags, culverts and swales within the limits of work. 3. Site drawings that identify the specific areas of interest (with dimensions). The drawings need to identify the location of utilities, Right of Ways, zoning setbacks as recorded by the Town of New London and deed information as recorded in the Merrimack County Registry of Deeds. 4. Material lists 5. Initial maintenance plan that will allow for establishment of the BMPs 6. Development of Operations and Maintenance (O&M) plan to preserve the integrity of the BMPs 7. Calculate estimated pollutant load reductions for sediment, phosphorus and nitrogen to be achieved by the design in accordance with NHDES approved methods and the SSPP. 8. Review current water sampling plan and recommend any additions to allow for the performance of the BMPs to be monitored and verified.