Remodel of two bathrooms located in the police department known as the men’s locker room and the lady’s locker room. Bathrooms must be ADA complaint. Men’s locker room to include: 2 sinks / 2 urinals / 2 showers and include all fixtures, parts & materials and labor. Both existing toilets and valves will be reused.Lady`s locker room to include: 2 toilets / 1 shower / 1 sink and includes fixtures, parts, materials and labor. Exploratory Venting & Plumbing Budget (not to exceed price.) This budget will be used to help with the current job, to help ensure that all work will function properly and to use the data for the next phase that will include more of an attempt to eliminate sewer smell from improper venting. Any exploration work that would need patching can be a time and material rate approved first by the Maintenance Supervisor in writing. Construction and Debris: remove men’s showers / remove toilet enclosures / remove drywall where needed / remove all ceiling panels, save ceiling grid. Remove Ladies shower surrounds / remove one toile surround / remove drywall where needed/ remove ceiling panels, save ceiling grid.