27.1. Vendor shall supply all labor, tools, transportation, materials, equipment and permits as necessary and required to perform services as described herein. 27.2. Vendor shall provide material safety data sheets with the delivery of any and all products covered by RSA 277- A, the “Worker’s Right to Know Act.” 27.3. The Vendor(s) shall provide supervision, labor, materials, transportation, tools, equipment, and machinery necessary to satisfactorily complete the Carpentry Services including, but not limited to: 27.3.1. Demolition of gypsum wall board, plaster, metal, masonry and wood wall systems 27.3.2. Demolition, repair or replacement of flooring and subflooring systems 27.3.3. Rough carpentry related to commercial construction of walls, doors, windows and ceilings 27.3.4. Finish carpentry related to commercial construction of walls, doors, windows and ceilings 27.3.5. Patching, caulking, priming and painting or staining of renovated areas 27.3.6. Installing ceramic and other wall tiles 27.3.7. Demolition, repair or replacement of ceilings 27.3.8. Demolition, repair or replacement of suspended acoustical tile ceilings 27.3.9. Demolition, repair, fabrication, installation or replacement of cabinetry 27.3.10.Installation and removal of temporary enclosures comprised of materials rated for the purpose 27.3.11.Protection of flooring and countertop surfaces with Builder Board, Ram Board or equivalent 27.3.12.Demolition, repair, or replacement of building envelope components 27.3.13.Installing of firestopping or caulking 27.3.14.Restoration cleaning of renovated areas 27.4. Agencies shall request services by issuing a Request for Quote (RFQ) with scope of work detailing as much information about the project as available. 27.5. Individual projects are not to exceed $25,000 including all costs associated with any individual project, including supervision, labor, mileage, equipment, construction equipment, machinery and supplies etc., unless a waiver is granted by the Director of the Department of Public Works. 27.6. The Vendor(s) shall be required to perform a site visit prior to submitting a fixed-price quote for individual projects at rates established in this contract(s). 27.7. For Carpentry Services requiring immediate attention, the Vendor(s) will work on a time and materials basis at rates as detailed herein. When submitting an invoice, the Vendor(s) must provide detail of the work performed, dates and location of the Carpentry Services, a copy of the material invoices to verify mark up and number of hours per person worked. 27.7.1. Hourly Rate - The Hourly Rate per person with tools and equipment to provide Carpentry Services as described herein. The Hourly Rate shall be for the actual amount of time at the respective job sites. 27.7.2. Materials - All materials shall be invoiced at a markup not to exceed 10% over contractor or subcontractor’s cost. 27.7.3. Subcontractors – The use of any subcontractors must be approved in advance by the State Project Manager. Any work performed by subcontractors shall be invoiced at a markup not to exceed 10% over contractor cost. 27.7.4. Equipment – For any machinery or special equipment required to complete the Carpentry Services, the Vendor(s) will receive a reasonable rental charge to which sum no percentage will be added. This rental charge must be approved in advance by the Agency Project Manager before any work begins. The rental rate shall include all fuel, transportation, lubricants, and the upkeep of the equipment. Equipment does not include any small tools and accessories for small tools.