THIS PROJECT IS PART OF THE TIER 2 FEDERAL RESURFACING PROGRAM AND INVOLVES 13.8 MILES OF PAVEMENT RESURFACING ON TWO (2) SECTIONS IN FOUR (4) TOWNS IN DISTRICT 3. 202.7 REMOVAL OF GUARDRAIL LF 5,425.00 203.5561 EAGRT PLATFORM PREFERRED U 5.00 203.5571 EAGRT PLATFORM PREFERRED, TL 2 - 25' U 1.00 206.1 COMMON STRUCTURE EXCAVATION CY 45.90 304.301 CRUSHED GRAVEL CY 7.90 403.11942 HBP-1/2" SURFACE MIX, MACHINE METHOD, HIGH STRENGTH, QC/QA TIER 2 TON 7,629.00 403.11952 HBP-3/8" SURFACE MIX, MACHINE METHOD, HIGH STRENGTH, QC/QA TIER 2 TON 150.00 403.12 HBP-HAND METHOD TON 44.00 403.16 PAVEMENT JOINT ADHESIVE LF 24,948.00 403.4 MATERIAL TRANSFER VEHICLE (MTV) TON 7,779.00 410.22 ASPHALT EMULSION FOR TACK COAT GAL 4,750.00 411.3 PLANT MIX SURFACE TREATMENT, PAVER SHIM TON 1,967.00 417. COLD PLANING BITUMINOUS SURFACES SY 70,113.00 417.21 MICRO-MILLING BITUMINOUS SURFACES SY 46,013.00 559.41 ASPHALTIC PLUG FOR CRACK CONTROL (F) LF 86.0