he work may include resurfacing, reconstruction, utility and drainage work, as well as excavation as required by the Town of Bedford in our Local Road rehabilitation program. This program will include approximately $4.2M of work over two years, 2026-2027, and may include the entirety or segments of the following roads: Aspen Lane, Balsam Court, Bedford Street, Bellemore Drive, Bourbon Street, Briar Court, Buttonwood Road, Cajun Court, Camelot Road, Campbell Road, Cotton Circle, Covenant Way, Greeley Hill Road, Hersey Street, Kalmia Way, Keene Street, Liberty Hill Road, Line Road, Mack Street, Ministerial Branch, Neighborhood Court, North Amherst Road, Orchard Hill Circle, Palomino Lane, Plains Road, Plummer Hill Road, Rockwood Court, Rolling Woods Drive, Ruth Street, Seton Drive, Stonehenge Road, Tiffany Lane, Wayside Drive, West Drive, White Avenue, Whisper Drive, Whittemore Street, Willowbrook Court, and Woodbury Lane, as well as other roads as directed by the Town. . State (NH DOT) Standards 2. Measurement and Payment 3. Clearing and Grubbing 4. Removal of Existing Pipe 5. Excavation 6. Embankment-in-Place 7. Gravel 8. Crushed Stone, Fine Grade 9. Pavement 10. Mortar Rubble Masonry Headwalls 11. Geotextile 12. Reclaimed Stabilized Base with Fine Grade 13. Reinforced Concrete Pipe 14. Underdrains 15. Trimming and Planing of Asphalt Drives 16. Erosion Control 17. Change Order