Specifications include, but are not limited to: The Scope of Services, as related to the US 50 CMP, should address (at a minimum) the following seven tasks: Task 1: Project Management Task 2: Existing Conditions Analysis, and Future Scenarios Analysis Task 3: Public, Stakeholder and Agency Involvement • Analysis of available reports, studies, and publications needs to be addressed. • Public Communications and Public Outreach (a minimum of three (3) public meetings), o Extensive public outreach – Stakeholder Identification and Involvement Plan, o Public meetings and community consensus building, (possibly organized by segments of corridor) including preparation of meeting materials and presentations, o Direct outreach and surveys, including online stakeholder surveys, o General Improvement District (GID)/ community/ neighborhood involvement, o Public education/ communications strategy