Specifications include, but are not limited to: The installation of approximately 6,440 linear feet (LF) of 8-inch water main and approximately 638 LF of 12-inch water main. The proposed configuration will require approximately 147 existing residential units to relocate water lateral connections from the backyard to the front yard, while also reconnecting approximately 34 water service lateral connections that currently exist in front yards. Work within the Project limits will also include the installation of approximately 5,145 LF of 8-inch sewer main, and 1,984 LF of 10-inch sewer main. This will require 133 sewer service lateral reconnections that currently exist in the front yards. No relocations of sewer service laterals from the backyard to the front yard are anticipated in Townsite Phase 2, This scope of work also includes replacement of the existing 6-Inch VCP sewer located in an alley between Nebraska Avenue and Texas Avenue with an 8-inch C900 PVC Sewer to facilitate maintenance access, and other improvement items as shown on the bid schedule, drawings and specified in the bid documents.