The work under this Contract includes mobilization and demobilization to and from the project site, as well as the removal of all equipment, materials, and debris from work locations upon project completion. The Contractor shall furnish all labor, equipment, materials, and services and account for applicable taxes, overhead, profit, and bonding requirements to perform the following tasks: 2.11.1 Geotechnical Report; 2.11.1.1 Conduct a geotechnical investigation to determine soil conditions at the project site. 2.11.1.2 Provide a geotechnical report, including recommendations for site preparation, compaction requirements, and foundation design considerations. 2.11.1.3 Perform soil testing per the applicable standards to assess bearing capacity and any necessary soil amendments or reinforcements. 2.11.2 Mobilization and Site Preparation; 2.11.2.1 Designation of area for material storage and equipment staging. 2.11.2.2 Delivery of necessary equipment, machinery, and materials to the job site. 2.11.2.3 Ensure proper storage, operation, and handling of vehicles, materials, tools, and equipment. 2.11.2.4 Initial setup of site safety and implementation of safety measures (signage/barriers). 2.11.2.5 Utility Protection – Identifying and protecting existing utilities before construction begins.