Specifications include, but are not limited to: Contractor shall include all labor, materials, equipment, engineering, permitting and services necessary to construct the project per approved plans and specifications. Construction includes but is not limited to the following: slot trenching and hydro excavation, demolition and removal of existing playground features and resilient surfacing, demolition and removal of existing shade structure and footings; demolition of existing concrete sidewalk and concrete pads; demolition of existing concrete seat walls and footings; demolition of turf and irrigation; Stub and cap selected existing utilities; installation of flatwork, concrete sidewalks and concrete mow curb; installation of interpretative signage; furnish and installation of new playground equipment, and safety surface; new metal shade structures; site furnishing include concrete picnic tables and benches; landscape work including the installation of trees, rock mulch, boulders, sod, and new drip irrigation.