Specifications include, but are not limited to: The proposed concrete overflow parking and Commercial Driver License (CDL) lot is approximately 183,000 sq. ft. located West of the Mobility Training Center (MTC) building and North of the Sunset Maintenance Facility (SMF) administration building. The concrete pavement shall be constructed in the existing dirt lot inside the SMF located at 5165 West Sunset Road, Las Vegas, Nevada. Work shall include, but not limited to: site clearing and removal of existing structures/obstructions; excavation & trench work, grading, Portland cement concrete pavement (PCCP) and structural steel reinforcement placement; surveying; existing utility verification & potholing; all electrical work related to site lighting installation including above ground and underground utilities; all pavement striping including the DMV coordination required for the CDL lot; compliance with Las Vegas Stormwater Quality Management Program requirements and additional scope of work as identified in the Bid Documents.