Specifications include, but are not limited to: Contractor to repair and replace to match existing finishes at locations where penetrations for demolition is necessary to install new conduit, relocate or install new fusible disconnects; including fire stopping as necessary. Any damage to existing adjacent surfaces not in the scope of work be repaired to match existing. Provide required safety signage as it relates to the scope of work. Contractor shall provide Conex{ype secured onsite storage at area indicated on plans. Contractor shall test and document proper function of all elevators at beginning and upon completion of each elevator. The work, at an existing 18 story high-rise building, consists of the modernization of one (1) hydraulic freight elevator (#12), one (1) hydraulic passenger elevator (#1 1), nine (9) gearless overhead traction elevators (#1-6, and 8-10), and one (1) gearless basement traction elevator (#7). At elevators 1-10, replace machinelmotor, controller, cables, and over-speed governor. At elevator 1-6, replace car operating panels, hall push buttons, position indicators to combo units and door operators, refurbish interior walls, and replace existing lighting kits at ceilings with led light kits. At elevator 7, replace operating panels, hall push buttons, position indicators to combo units and door operators, clean and polish interior walls and floors including returns, add graffiti shield, and replace ceilings with led light kit.