Specifications include, but are not limited to: The removal of the existing horse arena irrigation (including, but not limited to rotors, piping, valves and valve boxes), installation of new mainline (507.21.f.) running from lone mountain phase 1 (discovery park), the installation of new low angle turf nozzle (20 units) and lateral lines (1 ,1 1 3 l.f.) along the exterior of the arena, utilizing painted/powder coated stainless steel irrigation lines (110.5 Lf.) to suspend irrigation from the roof of the equestrian arena, in addition to the installation of a push button activation bollard to allow for public watering of the equestrian arena, new control panel for the bush button bollard and associated electrical connections.