Specifications include, but are not limited to: Construction includes all administrative work as required by Division One General Requirements; selective removal and replacement of approximately 1,200 lineal feet of existing sewer plumbing, selective demolition of existing gypsum finishes such as wallboard, lath and plaster, ceramic floor/wall tile including removal of existing fixtures and equipment as shown on architectural plans and as required to access and remove sanitary and vent plumbing lines: installation of new sanitary and vent sewer lines throughout the building including below slab sanitary sewer and grease waste lines. Construction also includes engineered slab on grade concrete, fire-stopping, sealant repairs; restoration of all affected finishes including but not limited to wall, ceiling, and lloorfinishes; reinstallation of plumbing and/or electrical fixtures and equipment; installation of new access doors; and all patching / painting of work areas as shown on architectural plans and specified herein.