Specifications include, but are not limited to: The Las Vegas Convention and Visitor's Authority has recently install three (3) new ground water remediation systems. Maintenance of these systems will be needed as will be new well testing and report requirements. The NV Department of Environmental Protection (NDEP) is requiring that monthly testing of the discharge water, regular quarterly testing that is done now, and once a year testing for heavy metals be conducted and reported. There are three ground water remediation systems, two for the “Gold Lot Remediation System” and one for “Hudson Cleaners”. Combined, the three systems have a total of thirty-six (36) monitoring wells, thirty (30) remediation wells, and nineteen (19) vapor extraction wells. The systems for the “Gold Lot” are located at 3150 Paradise Road, Las Vegas, NV 89109 and at 364 Convention Center Drive, Las Vegas, NV 89109 behind the new West Hall. The system for “Hudson Cleaners” is located at 364 Convention Center Drive, Las Vegas, NV 89109 in the southeast corner of the property behind Siegel’s Bagelmania Bakery.