Specifications include, but are not limited to: Casa Grande Transitional Housing (CGTH) Empty one (1) 1,500-gallon tank to be pumped every three (3) months or four (4) times per year. Florence McClure Women’s Correctional Center (FMWCC) Empty one (1) 4,500-gallon tank to be pumped every three (3) months or four (4) times per year. FMWCC requires additional scraping and pressure washing inside of the grease trap as necessary (to be included in the cost of grease trap pumping). Pump down and dispose of debris from sewer lift station bi-monthly or six (6) times per year. High Desert State Prison (HDSP) Empty one (1) 4,000-gallon tank to be pumped every three (3) months or four (4) times per year. First and Second stage weirs within trap system requires additional scraping and pressure washing as necessary. Jean Conservation Camp (JCC) Empty one (1) 1,500-gallon tank to be pumped every three (3) months or four (4) times per year. Southern Desert Correctional Center (SDCC) Empty two (2) 1,200-gallon tanks to be pumped every three (3) months or four (4) times per year. Empty one (1) 750-gallon tank to be pumped annually. Empty one (1) 2,000-gallon tank to be pumped annually. Three Lakes Valley Conservation Camp (TLVCC) Empty one (1) 5,000-gallon tank to be pumped annually and skimmed annually.