Specifications include, but are not limited to: The Work consists of removing existing diesel generator and automatic transfer switch at four locations. Construction includes the demo of concrete generator foundation, saw cut concrete driveway and remove soil for installation of conduit, repair damage landscaping and bring to original condition, install new generator and automatic transfer switch, install new conduit for PCC500 module between the diesel generator and the bldg. All excavation work required to complete the installation of underground conduit shall be performed utilizing vacuum excavation methods. TTB and install new generator PCC500 monitoring module using material noted on Drawings and specified herein.