Specifications include, but are not limited to: The Work consists of replacing the existing 150kW Generator, 400A ATS, associated power conductors, installation of new Power Command 500/550 monitoring syslem, exlension of the existing wall and installation of new generator pad. Construction includes all administrative work outlined in the general requirements. Contractor shall coordinate with utility company for service outage, installation of temporary power & re-energization of power to the building, removal of existing generator, ATS, conductors, and west side gate & mounting hardware. Demolish existing generator pad, flooring and wall. lnstall new conduit and network cable for the new PC500/550. lnstallation of new generator pad, flooring, wall, conductors, ATS, and generator. lnstallation of all electrical conduit and wiring to support the electrical and mechanical systems; installation of conlrols and monitoring system. Submit construclion phase plan for testing and operatiori of the power syslem from normal to emergency and back to normal. Paint new wall to match existing color. Remove rust on existing gate, frame and hardware, prime and paint to match existing color. Reinstall gate & mounting hardware, restore landscaping and sprinkler system