Specifications include, but are not limited to: Contractor is to perform an upgrade of the existing physical access control system per project documentation and drawings. A summarized design intent includes an upgrade and replacement of existing cable infrastructure to accommodate an open architecture IP-to-the-Door approach for all existing card readers locations. Contractor shall provide certified Berktek/Leviton CP5300 High PoE UTP System. Contractor shall provide and install (94) PoE reader interface modules and enclosures. Contractor shall provide terminations to existing electronic locking hardware, sensors, output devices and ancillary items that are to remain and used for continued operation. Contractor shall be responsible for existing device/s successful integration with new specified control system components, including any termination points as to ensure its usage and integration with new head-end equipment and software. Contractor will be responsible for basic configuration of new equipment and provide assistance to TMWA for integration of new components. Contractor shall provide Genetec Synerigis certification training for TMWA staff in order for owner direct support capabilities.