Specifications include, but are not limited to: Provide all manpower, equipment, and materials to remove the existing tower fills and replace with new tower fills in the Las Vegas Convention Center Central Plant. Scope includes, but not limited to: 1. Specifications per the Henderson Engineering drawings found in the attachment TAB, dated 6/23/20. 2. Existing cooling tower fills and drift eliminator to be removed/demolished for towers 11-14. 3. Existing cooling tower to be drained and thoroughly cleaned of all scale and disinfected. 4. Provide and install new cooling tower fill and drift eliminator per the Henderson Engineering drawings. 5. Contractor responsible to coordinate and obtain all required permitting to include the fees.