Specifications include, but are not limited to: Construction includes all administrative work as required by Division One General Requirements; selective demolition of existing gypsum finishes such as wallboard, lath and plaster, ceramic floor/wall tile including removal of existing fixtures and equipment as shown on architectural plans and as required to access and remove sanitary waste and vent plumbing lines; installation of new sanitary waste and vent sewer lines throughout the building including below slab sanitary sewer. Construction also includes restoration of all affected ,finishes including but not limited to wall and ceiling finishes; re-installation of plumbing and/or electrical fixtures and equipment; installation of new access doors; and all patching / painting of work areas as shown on architectural plans and specified herein.