Specifications include, but are not limited to: The project includes but is not limited to removing existing curb, gutter, sidewalk, and AC pavement and installing new concrete curb ramps and driveway aprons as shown on the plans. Mobilization, Demobilization and Clean-Up 1 LS 2 Traffic Control 1 LS 3 Storm Water Protection 1 LS 4 Sawcut and Remove AC Pavement and Haul to Landfill (Dump Tickets Provided by City) 1,430 SF 5 Permanent Pavement Patch – 5” Type 3 PG64-22 on 9” Type 2 Aggregate Base 1,430 SF 6 Remove Existing PCC Sidewalk and Flatwork and Haul to Landfill (Dump Tickets Provided by City) 1,500 SF 7 Remove PCC Curb and Gutter and Haul to Landfill (Dump Tickets Provided by City 180 LF 8 Remove PCC Driveway Approach and Haul to Landfill (Dump Tickets Provided by City) 255 SF 9 Remove PCC Pedestrian Ramp and Haul to Landfill (Dump Tickets Provided by City) 3,750 SF 10 Construct Type A PCC Sidewalk – 4” Concrete on 4” Aggregate Base 2,450 SF 11 Construct Type 1 Curb and Gutter on 6” Aggregate Base 180 LF 12 Construct PCC Pedestrian Curb Ramp with Detectable Warning Plate 1,820 SF 13 Relocate Existing Pedestrian Push Button and Post ( Must Coordinate Work With Carson City Signal Crew at least 72 Hours in Advance of Work) 1 EA 14 Relocate Sign and Post 1 EA 15 Adjust Existing Utility Box to Finish Grade 2 EA