UPDATE (04 August 2025): Sumbission have been extended to 1:00PM PDT on 06 August 2025. The solicitation has been updated as well to reflect the change.
UPDATE (25 July 2025): The PWS was revised to include the removal of 190 tons of contaminated soil that was removed from the airfield and placed on tarps.
UPDATE: The Questions and Answers have been posted as Attchment 3: PW 99 CES Fuel Spill Cleanup QA1
***UPDATED TO ADD ATTACHMENT: Combo Synopsis - 99 CES Fuel Spill_ Amendment 1. Site Visit will be conducted on 25 July 2025 at 9:00 AM PDT on Nellis AFB. Further instructions can be found in Combo Synopsis - 99 CES Fuel Spill_ Amendment 1***
***Please see updated POC information***
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in the Federal Acquisition Regulation (FAR) subpart 12.6, following FAR 13 Simplified Acquisition procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
1. The solicitation number is F3G3CE5147A002. This solicitation is issued as a Request for Proposal (RFP). A Firm Fixed Price type contract will be awarded.
2. The incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-04 June 11, 2025.
3. This combined synopsis/solicitation is being issued as a Total Small Business set-aside, and the associated NAICS code is 562910 Remediation Services, and a Small Business Size Standard of $25 million.
4. Below is the contract line-item number (CLIN) breakdown:
Item: 0001
Supplies/Services: Contaminated Soil Evacuation and Disposal IAW PWS
Qty: 1
Unit: Lot
Unit Price
Amount
5. DESCRIPTION OF SERVICES: Contractor shall provide all labor, materials, tools, equipment, transportation, and supervision necessary to clean up hazardous waste including containment, cleanup, and disposal of contaminated materials located on the Airfield at Nellis AFB. The contractor shall remove fuel-contaminated asphalt patches (150’ X 4’) and remove fuel contaminated soil Area: 25’ X 20’ to a depth of 6’or with concentrations of hazardous substances or petroleum substances that exceed soil action levels listed in NAC 445A.2272. Additionally, there is 190 tons of contaminated soil that was removed from the airfield and placed on tarps at the base landfill that will need to be disposed of included in this project. All contaminated soil shall be segregated and placed in designated containers for transport to a designated landfill or treatment facility approved by both the EPA and NDEP. The Civil Engineering Squadron will be responsible for replacing the soil that was removed.
PLEASE SEE “Attachment 1 - 99 CES Fuel Spill PWS” FOR MORE INFORMATION.
6. Period of Performance: 60 days ADC
7. Place of Performance: Nellis AFB, NV
8. Inspection and Acceptance: FOB Destination