The anticipated scope of construction includes comprehensive renovations to the Whitney Ranch Activity Pool facility. Work will include complete removal and replacement of approximately 7,400 square feet of white quartz-enhanced pool plaster (33% quartz aggregate), removal and replacement of the pool’s cleanouts, floor drains, light niches, and underwater lighting fixtures, and installation of new waterline tile and tile-inlay depth markers in compliance with Southern Nevada Health District standards. The existing concrete pool deck—approximately 36,000 square feet—will be resurfaced using a thermoplastic deck coating system, with Pool Surface Coatings’ AquaFlex specified as the Basis of Design. The project also includes the installation of a new 30' x 100' standing seam metal shade structure over a portion of the pool deck, complete with new plumbing and electrical service (including hose bibs, GFCI receptacles, and low-voltage conduit for future Wi-Fi connectivity). Additional improvements include the rehabilitation of an existing water slide and associated stairs, replacement of all deck drains with JOSAM PRO-PLUS 100C series drains, replacement of autofill and install new sealant at expansion joints, installation of a new play structure provided by the City, and various appurtenances to ensure code compliance, accessibility, and long-term durability.