The alignment includes 11,000 linear feet of 30-inch mortar lined and coated, tape wrapped steel pipe (MLTCP) waterline and a new pressure reducing valve (PRV). The project will begin at the connection to the existing 24-inch waterline in Via Nobila Drive (2760 PZ) at the intersection with the future Dan Shaw Drive The project alignment will continue south along Dan Shaw Drive, through the proposed Dan Shaw/Larson/Shayna Connector to Larson Lane. A 2630 PZ PRV will be installed near the intersection of Dan Shaw Drive and Larson Lane. The project alignment will continue east along Larson Lane to Bermuda Road and then north along Bermuda Drive to Volunteer Boulevard where there will be a connection to the existing 42-inchpipeline (2630 PZ).