1. General Requirements Coordinate fully with the owner and LVCC project manager for all logistics, staging, and phasing. Construction Progress Schedule using CPM methodology. Submittals, mockups, and RFIs managed via CMiC. Execution of a Quality Control Plan and adherence to inspections. 2. Architectural and Structural Work Selective demolition of interior systems and finishes Installation of new cast-in-place concrete, steel framing, and related assemblies. Firestopping, waterproofing, insulation, and structural components. 3. Interior Finishes New gypsum board systems, ceilings, paint, and acoustical panels. Flooring includes terrazzo, tile, and custom-patterned carpeting. Full restroom finishes and fixture replacement. 4. Signage Installation Wayfinding, ADA signage, room ID placards, and emergency signage. Fabrication and installation per Signage Package Sequence C. 5. Lighting Systems Interior: Edison Price DL/4 and WL/4, Bartco BIOS Cove, Focal Point Seem 4. Exterior: McGraw-Edison GWC and GLEON luminaires.