Specifications include, but are not limited to: The project consists of the removal and disposal of the existing interior sports court tile flooring and base system, adjustments to basketball goals, adjustments to exterior doors to accommodate floating wood athletic system and selective demolition of exterior concrete at the recreation center's gymnasium adjacent to the perimeter of the buildings at select openings. The new flooring system is approximately 5,078 square foot floating wood athletic floor installed over the existing slab on grade with associated transition modifications (ADA compliant) at the doorways and adjustments to the basketball goals and volleyball sleeves. The project will also include light fixture retrofit upgrades to led lights within the gymnasium space and replacement and relocation of the indoor scoreboard with new scoreboard while re-routing and reusing existing power circuit for the scoreboard. Turn existing sports court tiles over to Clark County parks and recreation.