1. MDF/IDF a. Furnish (1) Wrightline Paramount cabinet b. Install (5) LVMPD provided Wrightline cabinets c. Furnish and install ladder rack in the MDF and IDF as per LVMPD standard layouts of MDF and IDF rooms d. Furnish and install the communications grounding within the MDF and IDF as per LVMPD standards in the MDF and IDF room. 2. Fiber Backbone a. Furnish and install (1) 12 Strand OM4 Multimode fiber and (1) 12 Strand SM fiber from the MDF to the IDF b. Terminate these fibers at each end on fusion splice pigtails c. Place fiber pigtails in rack mount fiber housings at each end with the appropriate LC adapter panels. 3. Voice and Data a. Furnish and install cables and connecting hardware (jacks, faceplates, patch panels, etc.) for (74) standard voice and data locations. 4. TV a. Furnish and install cables and connecting hardware (jacks, faceplates, patch panels, etc.) for (4) standard TV locations 5. Speakers a. Furnish and install 18/2 AWG plenum cabling for (4) speaker locations in the conference room. 6. WAPs a. Furnish and install cables and connecting hardware (jacks, faceplates, patch panels, etc.) for (50) standard AP locations. Mount LVMPD supplied access points. Furnish and install 4ft drop down conduit and outlet boxes to hand the Aps in the warehouse area. 7. Cameras a. Furnish and install cables and connecting hardware (jacks, faceplates, patch panels, etc.) for (29) standard camera locations 8. Test and label the above mentioned cables and connecting hardware. 9. Provide as-built drawings and test results upon completion.