The Project is in Dayton, Lyon County, NV and more specifically beginning at Silver Street and running parallel with Highway 50 and ending at the northern extents of the Highway 50 Sewer Replacement Project ? Phase 1 (Previously Constructed). This project will include the abandonment/removal of existing sanitary sewer main and manholes, handling/coordination/disposal of contaminated materials, upsizing of approximately 1,950 linear feet of sanitary sewer pipe through conventional trench/jack and boring methods and will include the construction of new manholes adjacent to the existing sewer main alignment, bypass pumping, precast concrete fence installation, lateral reconnections, surface restoration, tree removal, and Dayton Valley Inn sign relocation.