Demolition The Contractor Shall: Disconnect and remove the existing thermostats, circulator pumps, control relays, expansion tank, hot water tank, and discontinued piping not needed per new installation. Dispose of or salvage all materials in accordance with all applicable laws and regulations. Properly seal, to industry best practices, any gaps, holes or voids created by the removal of any materials during the demolition process to include, but not limited to foundation, walls and floors. Installation The Contractor Shall: Install the water heater in accordance with the Nevada/Clark County/Las Vegas Building Code(s) and the manufacturer’s recommendations. Install all supply lines, electrical, ventilation and plumbing, to include but not limited to expansion tank, manifolds, particle filters, pressure relief valves, controls, fittings, and any heat-zone piping in accordance with manufacturer’s recommendations to make a complete system. Tie the new hot water heating system into the existing heat zoning design, with independent thermostatic programmable controls. Water heaters will be installed in the following buildings: 1301 – one (1) water heater 1302 – two (2) water heaters 1306 – two (2) water heaters 1308 – one (1) water heater 1309 – one (1) water heater 1310 – one (1) water heater