Rope Course Demolition – Contractor is responsible to provide all equipment, tools, labor, material to properly remove rope course material. All vertical poles, vertical structures, wooden boards, rope/netting removed can be placed neatly in a pile in fence in area. All other debris and bleachers will be properly disposed of by contractor. Remove all vertical structures Remove all (17) vertical poles from ground and place in a neatly pile for Office of the Military to relocate. Remove (1) vertical pole that is laying on ground Remove (1) short vertical pole that is laying on ground Remove all wire guides and foundations that wire guides to vertical structures Remove all platforms Excavate and remove all upright concrete footings estimate to be 3ft below grade. Restore and compact ground all areas that foundations have been removed Remove all material/wooden boards on structures Remove all steel cable guidelines, guying and supports Remove all rope/netting Remove all items that are on the structures Remove bleachers Remove all debris and lose boards that have fallen on the ground and any foreign materials Remove any 4x4 post that are laying on the ground along with any guide wire around them Remove all debris that’s near the conex box