Specifications include, but are not limited to: The “Construction” includes all administrative work as outlined in the Division One General Requirements; selective removal and replacement of HVAC systems, including split and package systems, and all applicable associated ductwork, refrigerant piping, diffusers/grilles and controls as outlined in the project specifications and drawings. Sealing and moisture protection as required. Selective demolition as described in the project drawings. Installation of an aluminum framed storefront door and storefront sliding window. Door and window installed based on project specifications and drawings. Installation of new t-grid and acoustical tiles. Installation of new VCT flooring. Application of new paint where indicated on project drawings. Fabricate and install custom casework.