Specifications include, but are not limited to: 1. Contractor to provide all repairs in accordance with the Contract Drawings and Specifications prepared by The City of Reno Housing Authority (RHA) dated 01/22/2020. 2. Contractor will remove and replace all angle stops at the Kitchen Sinks, Bathroom Lavatories and at the Water Closets in 100 dwelling units and the Community Building. 3. The existing angle stops are sweat fittings on copper water lines. 4. Contractor will remove the existing angle stop valve, extend the copper supply line and install a new 1/4 turn angle stop valve (see Specifications and Instructions). 5. All work to be performed as required by all applicable building codes. 6. Contractor is responsible for obtain all permits required. 7. Contractor will be required to provide a building final prior to release and final payment.