Specifications include, but are not limited to: All labor, material and equipment to complete the BC TAP TRANSFORMER BREAKER REPLACEMENT ABOVE GRADE CONSTRUCTION project as described in the specifications and shown in the plans. Work includes: 1) Remove the existing one (1) 230KV disconnect switch/support and one (1) 230KV OCB. 2) Install one (1) 230KV disconnect switch/support, one (1) 230KV circuit breaker, three (3) 230KV CCVTs/supports, three (3) single phase 230KV bus supports, and one (1) 69KV PT/support. 3) Leave in place the existing autotransformer on the pad, remove allhigh/low side jumpers. Install a minimum #2/0 AWG copper wire to short alltransformer bushings and connect to ground. 4) Remove existing and install new 230/69KV aerial lines wire jumpers associated connectors, hardware insulators. 5) And upgrade Relay Control Panel located inside the control house