The SERVICE PROVIDER agrees to perform professional and technical engineering services to ensure the construction of Project BR-080-1-(342) Interstate 80 (I-80) Reno Bridge Replacement Project in Washoe County is accomplished in conformance with the plans, specifications, and all other contract documents. The project is expected to start in the Fall of 2025 and conclude in December of 2027. The SERVICE PROVIDER shall provide up to one (1) Principal Engineer to act as Project Manager, one (1) Assistant Resident Engineer*, one (1) Office Manager*, one (1) Public Information Officer*, one (1) Critical Path Method (CPM) Scheduler, four (4) Inspectors Level IV*, one (1) Non-Destructive Testing Inspector, one (1) Inspector Level III, four (4) Tech III Testers with one (1) being an out of state Tester for the purposes of testing concrete bridge girders. The SERVICE PROVIDER shall also supply vehicles, iPads or Windows-based tablets, computers, cell phones, office equipment, proper safety equipment, nuclear density gauges and specialized training for all personnel assigned to this project. *Positions are considered “key personnel”. The SERVICE PROVIDER shall provide incidental equipment as may be required by the DEPARTMENT. The SERVICE PROVIDER shall provide all personnel assigned to this project the proper safety equipment, including but not limited to, soft caps, hard hats and vests meeting the current DEPARTMENT standards for Work Zone Apparel. Proper training and certifications for all nuclear gauge users is required and Service Provider must adhere to the “Consultant Nuclear Requirements” as provided in Attachment B Consultant Nuclear Requirements of this Request for Proposal.