Specifications include, but are not limited to: BEATTY AIRPORT: • AWOS - Design & Construction; • Tortoise Fence (20,000 LF) - Design & Construction; • Replace MIRL (5,612' x 60'), Install REIL's - Design & Construction; • Replace Apron Lights (14,564 SY) - Design & Construction; • New Helipad (1,400 SY) - Design & Construction; • Rehabilitate Runway 16-34 (5,612' x 60') Design & Construction; • Rehabilitate taxiway B (400' x 35') - Design & Construction; • Rehabilitate Apron (11,564 SY) - Design & Construction; • Construct Parallel Taxiway A (5,450' x 35') - Design; • Construct Parallel Taxiway A (5,450' X 35') - Construction; GABBS AIRPORT: • Install Airport Beacon and Segmented Circle Lights; • Rehabilitate Unpaved Runways – Design & Construction RW 9/27 (5950’ x 60’) and RW 16/34 (2,650’ x 60’); • 6’ Chain-Link Fencing with 3-strand Barbed wire (23,000 LF); • Rehabilitate Unpaved Runways – Design & Construction RW 9/27 (5950’ x 60’) and RW 16/34 (2,650’ x 60’); TONOPAH AIRPORT: • Rehabilitate Runway 15-33 (7,160’ x 75’) Design & Construction; • Replace Existing MIRL- Design & Construction; • Replace Existing MITL - Design & Construction; • Install Reil’s – Design & Construction; • Rehabilitate Aircraft Apron (445’ x 425’) – Design; • Rehabilitate Aircraft Apron (445’ x 315’) – Construction; • Rehabilitate Taxiway A (8,200’ x 35’) – Design & Construction; • Construct Snow Removal Equipment Storage Building (40’ x 80’)